The 'FTR' system is an example of the public transport concept of bus rapid transit. FTR has been introduced by First Group, using Wright StreetCar articulated buses in conjunction with infrastructure upgrades provided by local authorities.
The vehicles are branded as ''the future of travel'', First stating that "ftr" is texting shorthand for "future"[1]. Each 'StreetCar' vehicle costs over £300,000, and features a separate driver ('pilot') compartment at the front, resembling to some extent similar designs in continental Europe.
The main fundamental difference to conventional bus services is the method of fare collection - which involves payment of cash fares to a self-service ticket machine rather than to the driver who is not intended to have any contact with passengers. This feature was promoted as helping to reduce journey times, although achieving this would depend somewhat on a large-scale transfer to prepaid tickets, available for example through a network of PayPoint retailers. Otherwise the vehicle itself is modified over a conventional bus, with styling similar to contemporary trams and greater distances between axles in order to maximise the low-floor area for easily-accessible seating.
The first instance of FTR in the United Kingdom is the conversion of route 4 in York, where the service began on 8 May 2006, the city council having made significant and expensive alterations to the road layout to accommodate the new vehicles. The conversion of Route 4 in Leeds to FTR is the second example, where the service began in early 2007. It runs between Pudsey and Whinmoor, via City Square. It has been announced that Swansea will be the recipient of a similar operation in 2007, with Sheffield also due to have at least one route converted to the same standard.
FTR is a collection of many innovations all being trialled simultaneously. The vehicle type, its configuration, the fare collection arrangements, the changes to infrastructure and an integrated data handling system for voice radio, vehicle location, real time passenger information, on-board displays, vehicle diagnostics, and ticket machine data.
It is fully expected that some of these innovations will be modified, enhanced or deleted with experience.
FTR is receiving awards for technical innovation and its Project Director specifically for her contribution to the industry.

Contents
York
Leeds
Criticisms
Support
References
External links

York


Main articles: First York

Service 4 (between Acomb and the University of York) was revised on the introduction of the new 42-seat vehicles to operate every 10 minutes in both directions, replacing eight conventional 41-seater buses each hour. This is ultimately a reduction in capacity, although the Streetcar buses have a much higher nominal standing capacity, which in practice is never achieved as this would result in crush-loading preventing adequate flow of boarding and alighting customers at bus stops.
The migration of passengers to off-vehicle ticket purchase has been slower than expected despite incentives.
With more than anticipated numbers of passengers still buying tickets on-board the quicker boarding times have not materialised partly due to technical problems with the on-board ticketing equipment (such as software glitches and coins being rejected). A rush of passengers (for example at the railway station) can therefore delay a vehicle by several minutes causing the bus nominally 10 minutes behind to catch up and usually pass the busier one in front.
The length and manoeuvrability of the vehicles is another issue in a comparatively small and congested city like York, with severe problems at constrained points where two opposing vehicles meet or at bus stops where two buses have bunched running the risk of junctions being blocked. York service 4 follows a somewhat tortuous route involving some relatively narrow streets and tight turns for which the articulated 'Streetcars', actually an ordinary articulated bus chassis, are not best suited, leading to the unfetching nickname of "understeer streetcar" being used by some drivers. A general lack of space for proper bus priority means that the vehicles are prone to becoming held up in traffic jams.
Experience elsewhere in the UK has led to self-service ticket machines being located at roadside bus stops (London) or conductors being carried (Sheffield Supertram) in order to minimise the time spent stationary. In the former instance inspectors carry out the necessary random on-board ticket checks to prevent fare evasion, in a similar way to the current situation in York.

Leeds


Main articles: First Leeds

First Bus, FTR in Lowtown, Pudsey, Leeds, running on the No 4 Route.

Following the cancellation of the Leeds Supertram project Metro have introduced various bus rapid transit options one of which is a FTR service, running Route 4 (Pudsey-City-Whinmoor). Many observers consider that the extent to which "FTR" is successful in Leeds will determine whether large-scale adoption of the concept throughout other British urban areas is likely. Leeds council have recently announced they are studying a tram-train to traverse the city center streets and the local rail network. Whether this will be instead of the Quality Bus is uncertain. FirstGroup is presently the only large UK transport company promoting such vehicles, with other major operators such as Stagecoach and Lothian Buses preferring to avoid the additional outlay involved in procuring the Streetcar-type bus and instead purchase a larger number of conventional single and double deckers for fleet renewal and upgrading.

Criticisms


The launch of the FTR generated almost saturation coverage in the local media.[2] On 10 May The Press devoted four full pages to it, including its front page and a double page spread of 12 readers' letters, almost all of them hostile. The next day the paper published a defence of the vehicles' teething problems by First York's commercial director accompanied by another five hostile letters. Another full-page article appeared on 12 May. On 17 May councillor Ann Reid was quoted as saying "The majority [of complaints] seem to have come from those who don't live on the route or certainly don't even catch the bus", it should also be noted that neither does Ann Reid.[3]. On 15 May the issue reached the national press.[4] Some transport planners believe that the complaints are an expression of general middle class hostility towards public transport.[5], although it should be noted response to tram systems has generally been enthusiastic.
The York trial has so far been largely unpopular with the public. The service it replaced was viewed by most as relatively modern and adequate, and some passengers consider the new vehicles are less convenient to use due to new payment systems and technical difficulties. The fares also went up in the period leading up to the introduction of the FTR (see York Press, York Vision, Nouse, etc.), and it has been suggested that the buses appear futuristic purely for show, which does not benefit the public in any way.
Other criticisms include:

★ The presence of two personnel on the buses (a driver and a customer host) may increase costs compared to the conventional buses which only required a driver.

★ Industry sources believe that FTR projects may be being used by the government as a cheap alternative to light rail systems.[6]

★ The separation of the driver from the passengers makes passenger communication with the driver more difficult, creating problems for anyone in need of directions or advice.

★ The ticketing machine does not give change, nor accept one-, two- or five-pence coins. Passengers must have exactly the right change to board. In addition, discount tickets are not available so a family of four, for example, would need four amounts of the exact change.

★ Passengers without the correct change for their ticket may be ejected from the bus at the next stop which may cause a problem for vulnerable passengers at night.

★ The automatic ticketing machines require passengers to select their tickets and insert their correct change in the space of only a few seconds, which may make them difficult to use for elderly or disabled passengers. The route that the FTR buses take in the York scheme pass by a retirement home and a hospital for the mentally ill so these passengers may not be uncommon.

★ The length of the vehicles can cause congestion when more than one bus arrives at a stop at the same time.

★ Some have commented that the new ticketing system makes fare avoidance easier although the CCTV systems within the vehicles are an attempt to minimise this.

★ The bus often fails to stop at the correct bus stop or mechanical problems prevent the doors from opening when they are supposed to.

★ To allow a shorter boarding and alighting time the bus should have at least 3 doors, as it is common with articulated buses, and may not only one ticket machine. Because the driver is not controlling the tickets boarding should be allowed at all doors like at trams.

Support


Several features of the new service during its trial in York have pleased passengers, including:

★ The conductors (when present) can make for a more pleasant journey as they can assist passengers in buying tickets or give travel advice. However, there will not be conductors when the trial period has concluded.

★ The group seating areas in the back half of the buses allow large groups to sit together and talk more easily during the journey.

★ The vehicles have been designed to make refurbishment straightforward to freshen their appeal every few years. FirstGroup's record has not been impressive when it comes to maintaining the appearance of its existing fleet of conventional buses.

★ They are fully air-conditioned, allowing for a more pleasant journey in the summer months. Some passengers have complained at the lack of opening windows, which led to very uncomfortable journeys during the summer months of 2006 when the air conditioning failed to operate on some vehicles. It should be noted, however, that other articulated vehicles in York (operating on park-and-ride services) also have no opening windows and only two sunroofs, which are driver-controlled.

References


1. FTR - the future of travel
2. Thomas, R. (2006), 'The future of public transport' meets hostile response in York, ''Local Transport Today'', no.444, 1 June 2006.
3. 2nd ref
4. Clark, A. (2006), The rise of the purple people-eaters, ''The Guardian'', 15 May 2006.
5. Emmerson, G. (2006), Is the 'ftr' really the future of public transport?, ''Local Transport Today'', no.445, 15 June 2006.
6. guardian2

External links



FTR Official Website

BBC coverage of the trial in York

BBC coverage of the Swansea announcement

A more detailed FAQ on the actual buses

Article in student newspaper Nouse - 'FTR buses meet fierce criticism'

Latest FTR and bus rapid transit news on Transport Briefing

A proposed route in Coventry and Warwickshire branded as "Sprint"

This article provided by Wikipedia. To edit the contents of this article, click here for original source.