GREAT CENTRAL RAILWAY


The 'Great Central Railway' ('GCR') was a railway company in England which came into being when the Manchester, Sheffield and Lincolnshire Railway changed its name in 1897 in anticipation of the opening in 1899 of its London Extension (See Great Central Main Line). In 1922 it was grouped into the London and North Eastern Railway.

Contents
History
The new GCR
The "London Extension"
Other new lines
Joint working
Key Officers
General Managers
Locomotive Engineer
Chief Mechanical Engineer
GCR locomotives
Pollitt's locomotives
Robinson locomotives
Major stations
Wath marshalling yard
Docks
Grimsby docks
This dock [71 acres (29ha)] was mainly concerned with the movement of coal, and was completed in 1912.
Historical Study Group

History


The new GCR

Upon assuming its new title, the GCR main line ran from Manchester London Road Station via Penistone, Sheffield, Brigg and Grimsby to Cleethorpes. A second line left the aforementioned line at Penistone and served Barnsley, Doncaster and Scunthorpe before rejoining the Grimsby line at Barnetby. Other lines linked Sheffield to Barnsley (via Chapeltown) and Doncaster (via Rotherham and also a line linking Lincoln and Wrawby Junction. Branch lines in north Lincolnshire ran to Barton-upon-Humber and New Holland and served ironstone quarries in the Scunthorpe area. In the Manchester are lines ran to Stalybridge and Glossop.
In the 1890's the MS&LR began construction of its "Derbyshire Lines", in effect the first part of its push southwards. Leaving its east - west main line at Beighton Junction, some 5 1/2 miles east of Sheffield, the line headed towards Nottingham, a golden opportunity to tap into the collieries in the north of county before reaching that city. A loop line was built to serve its new Central Station in Chesterfield.
The "London Extension"

The MS&LR had obtained Parliamentary approval in 1893 for its so-called 'Extension to London'.
On 1 August 1897 the original name of the railway was changed to become the 'Great Central Railway'. Building work started in 1895: the new line, some 92 miles (147km) in length, opened for coal traffic on 25 July1898; for passenger traffic on 15 March 1899, and for goods traffic on 11 April 1899.
The new line was built from Annesley in Nottinghamshire to join the existing Metropolitan Railway (MetR) Extension at Quainton Road, where the line became joint MetR/GCR owned, to return to GCR metals at Harrow for the final section to Marylebone. On 2 April1906 an "Alternative Route" or "alternative main line", running from Grendon Underwood Junction to Neasden was opened. The line was joint GCR/GWR between Ashenden Junction and Northolt Junction.
It was the last complete mainline railway to be built in Britain until section one of the Channel Tunnel Rail Link opened in 2003. It was also one of the shortest-lived intercity railway lines, being closed to passenger trains between Aylesbury and Rugby Central in 1966, leaving villages such as Woodford Halse without a railway. A Diesel Multiple Unit (DMU) shuttle service ran between Rugby Central and Nottingham (Arkwright Street) until it was also withdrawn in 1969.
Currently Chiltern Railways uses the lines south of Aylesbury for local services into London, and uses the Alternative Route south of Haddenham and the widened lines south of Neasden as the southern part of its main line from Birmingham to London.

Other new lines



★ The Lancashire, Derbyshire and East Coast Railway (LD&ECR): This railway was opened in 1897, principally to link the coalfields with deepwater ports, and was intended to run from Sutton on Sea in Lincolnshire to Warrington in Lancashire. In the event only the section between Pyewipe Junction, near Lincoln and Chesterfield Market Place, with some branch lines, was ever built. It was purchased by the GCR on 1 January1907, providing a better link between the London main line and the east coast.

Wrexham, Mold and Connah's Quay Railway purchased 1 January1905

North Wales and Liverpool Railway: same date

★ ''Wigan Junction Railway'': 1 January1906

Liverpool, St Helens and South Lancashire Railway: same date

★ ''North Lindsey Light Railway'' Scunthorpe to Whitton: opened throughout 1 December1910; worked by GCR, carried passengers, although its main freight was ironstone

Joint working


Apart from the three branches in the Liverpool area noted above, the GCR lines proper in the north of England were all east of Manchester. Nevertheless, GCR trains could run from coast to coast by means of joint working with other railways. The largest of those utilized in this way were those under the Cheshire Lines Committee: the other participants were the Midland Railway and the Great Northern Railway, taking in both Liverpool and Southport. Other joint undertakings were (west to east):

Manchester, South Junction and Altrincham Railway (GCR/LNWR)

Oldham, Ashton-under-Lyne and Guide Bridge Railway (GCR/LNWR)

★ ''Macclesfield, Marple and Bollington Railway'' (GCR/NSR); including its Hayfield branch

South Yorkshire Joint Railway (GCR, GNR, Lancashire and Yorkshire Railway, MR and North Eastern Railway)

Sheffield District Railway(GCR and MidR)

★ ''West Riding and Grimsby Joint Railway'' (GCR/GNR) - giving access to Wakefield and thence to Leeds

Key Officers


For those in position prior to 1899, dates are as served for the MS&LR.
General Managers


1886-1902 Sir William Pollitt (knighted 1899, later Lord Stuart of Wortley)

1902-1922 Sir Samuel Fay (knighted 1906)
Locomotive Engineer


1894-1900 Harry Pollitt
Chief Mechanical Engineer


1900-1922 John George Robinson, for whom the post was created

GCR locomotives


These could generally be divided into those intended for passenger work, especially those used on the London Extension and those for the heavy freight work.

★ see Locomotives of the Great Central Railway
Pollitt's locomotives

These were those taken over from the MS&LR, mainly those of class F2, 2-4-2 tank locomotives, and also classes D5/6 4-4-0 locomotives.
Robinson locomotives

During Robinson's regime, many of the larger express passenger engines came into being:

★ Classes B1-B9: 4-6-0 tender locomotives

★ Classes C4/5: 4-4-2 tender locomotives

★ Classes D9-11: 4-4-0 tender locomotives

★ Class J13: 0-6-0T

★ Classes L1/L3: 2-6-2T

★ Classes O4/5: 2-8-0, heavy freight locos, including ROD engines

★ Class Q4: 0-8-0 heavy shunting locomotive

★ Class :three locos used at Wath marshalling yard

Major stations



Marylebone

Manchester London Road

Nottingham Victoria

Sheffield Victoria

Leicester Central

Rugby Central

Wath marshalling yard


The new marshalling yard at Wath-upon-Dearne was opened in November 1907. It was designed to cope with coal trains, full and empty; it was worked with electro-pneumatic signalling.

Docks


Grimsby docks

Grimsby was dubbed the "largest fishing port in the world" in the early 20th century; it owed its prosperity to the ownership by the GCR and its forebear, the MS&LR. Coal and timber were also among its biggest cargoes. There were two main docks: the ''Alexandra Dock'' (named for Queen Alexandra) and the ''Royal Dock'', the latter completed in 1852. The total area of docks was 104.25 acres (42ha). These docks were linked by the Union Dock
===Immingham Dock=


This dock [71 acres (29ha)] was mainly concerned with the movement of coal, and was completed in 1912.

External links==

Lists of LNER locomotives, including those of the GCR taken over at grouping

Channel Tunnel schemes

★ ''There appear to be no links to the GCR as a complete system. The following are only concerned with the preserved GCR:''


Homepage of preserved Great Central Railway in Leicestershire


Homepage of Central Railway (proposal (2003) to reinstate the line primarily for freight)
Historical Study Group


Homepage of the Great Central Railway Society

www.railwayarchive.org.uk The Last Main Line - history and photographic archive of Great Central Railway ''This archive only covers the London extension'':

This article provided by Wikipedia. To edit the contents of this article, click here for original source.

psst.. try this: add to faves