:''This article is an expansion of a section entitled
'History' from within the main article: '
New York City Subway'''
The
New York City Subway has a long history, beginning as many disjointed systems and eventually merging under City control.
Early steam and elevated railroads
:''See also:''
Beach Pneumatic Transit
The beginnings of the Subway came from various excursion railroads to
Coney Island and
elevated railroads in
Manhattan and
Brooklyn. At that time,
New York County (
Manhattan Island and part of the
Bronx),
Kings County (including the Cities of
Brooklyn and
Williamsburg) and
Queens County were separate political entities.
In New York, competing steam-powered elevated railroads were built over major avenues. The first elevated line was constructed in 1867-70 by Charles Harvey and his
West Side and Yonkers Patent Railway company along Greenwich Street and Ninth Avenue (although
cable cars were the initial mode of transportation on that railway). Later more lines were built on
Second,
Third and
Sixth Avenues. None of these structures remain today, but these lines later shared trackage with subway trains as part of the
IRT system.
In Kings County, elevated railroads were also built by several companies, over
Lexington,
Myrtle,
Third and
Fifth Avenues,
Fulton Street and
Broadway. These also later shared trackage with subway trains, and even operated into the subway, as part of the
BRT and
BMT. Most of these structures have been dismantled, but some remain in original form, mostly rebuilt and upgraded. These lines were linked to Manhattan by various
ferries and later the tracks along the
Brooklyn Bridge (which originally had their own line, and were later integrated into the BRT/BMT).
Also in Kings County, six
steam excursion railroads were built to various beaches in the southern part of the county; all but one (the Manhattan Beach Line) eventually fell under
BMT control.
The first subways
In
1898, New York, Kings and Richmond Counties, and parts of Queens and Westchester Counties and their constituent cities, towns, villages and hamlets were consolidated into the
City of Greater New York. During this era the expanded City of New York resolved that it wanted the core of future rapid transit to be underground
subways, but realized that no private company was willing to put up the enormous capital required to build beneath the streets.
The City decided to issue rapid transit
bonds outside of its regular bonded debt limit and build the subways itself, and contracted with the
IRT (which by that time ran the elevated lines in Manhattan) to equip and operate the subways, sharing the profits with the City and guaranteeing a fixed five-cent fare.
At this time, the original subway (''Contract 1'') was built from
City Hall to
the Bronx, with the first part opening in October
1904; an extension to
Atlantic Avenue at the
LIRR Flatbush Avenue terminal in
Brooklyn was built soon after as ''Contract 2''.
The subway system began at a time when
Thomas Edison and his opponent,
Nikola Tesla, in the electricity industry were trying to decide whether to accept
alternating current or, as Edison wanted,
direct current as the standard way to deliver electricity. Edison lost the battle and alternating current became the standard, but not before the New York City Subway adopted direct current. As a result, to this day, the city has to convert alternating current to direct current when it buys electricity to power the trains.
In Brooklyn, the various elevated railroads and many of the surface steam railroads, as well as most of the
trolley lines, were consolidated under the
BRT. Some improvements were made to these lines at company expense during this era.
The Dual Contracts
Main articles: Dual Contracts
The BRT, which just barely entered Manhattan via the
Brooklyn Bridge, wanted the opportunity to compete with the IRT, and the IRT wanted to extend its Brooklyn line to compete with the BRT. This led to the City's agreeing to contract for future subways with both the BRT and IRT.
The expansion of rapid transit was greatly facilitated by the signing of the ''Dual Contracts'' in
1913. ''Contract 3'' was signed between the
IRT and the City; the contract between the
BRT and the City was ''Contract 4''. The majority of the present-day subway system was either built or improved under these contracts, which not only built new lines but added tracks and connections to existing lines of both companies. The
Astoria Line and
Flushing Line were built at this time, and were for some time operated by both companies.
The Independent System
Main articles: Independent Subway System
The City, bolstered by political claims that the private companies were reaping profits at taxpayer expense, determined that it would build, equip and operate a new system itself, with private investment and without sharing the profits with private entities. This led to the building of the ''Independent City-Owned Subway'' (ICOS), sometimes called the ''
Independent Subway System'' (ISS), the ''Independent City-Owned Rapid Transit Railroad'', or simply ''The Eighth Avenue Subway'' after the location of its
premier Manhattan mainline. After the City acquired the
BMT and
IRT in
1940, the Independent lines were dubbed the ''
IND'' to follow the three-letter
initialisms of the other systems.
As the first line neared completion, New York City offered it for private operation as a formality, knowing that no operator would meet its terms. Thus the city declared that it would operate it itself, formalizing a foregone conclusion. The first line opened without a formal ceremony. The trains began operating their regular schedules ahead of time, and all stations of the
Eighth Avenue Line, from
207th Street in
Washington Heights to
Hudson Terminal (now World Trade Center), opened simultaneously at one minute after midnight on
September 10,
1932.
Magnificently
engineered, almost entirely underground, with ~670 foot (~204 m.) platforms and
flying junctions throughout, the IND system tripled the City's rapid transit debt, ironically contributing to the demise of
plans for an ambitious expansion proposed before the first line of the first system was even opened.
Unification and contraction
In June
1940, the transportation assets of the former
BMT and
IRT systems were taken over by the City of New York for operation by the City's Board of Transportation, which already operated the
IND system. In
1953 the
New York City Transit Authority, a state agency incorporated for the benefit of the city, now known to the public as ''MTA New York City Transit'', succeeded the BoT.
A combination of factors had this takeover coincide with the end of the major rapid transit building eras in New York City. The City immediately began to eliminate what it considered redundancy in the system, closing several elevated lines including the
IRT Ninth Avenue Line and most of the
IRT Second Avenue El in Manhattan, and the
BMT Fifth and
Third Avenue Lines and most of the
BMT Fulton Street Line in Brooklyn.
Despite the unification, a distinction between the three systems survives in the service labels: IRT lines (now referred to as
A Division) have numbers and BMT/IND (now collectively
B Division) lines use letters. There is also a more physical but less obvious difference: Division A cars are narrower than those of Division B by 18 inches (~45cm) and shorter by 9 to 24 feet (~2.7 to 7.3m).
The original IRT subway lines were built to modified elevated line dimensions. Whereas the IRT els were originally equipped with cars that were 47 feet long, the cars designed for the IRT subway measure 51 feet 4 inches long. Both sets of lines permitted cars not wider than 9 feet. The clearances and curves on these lines are too narrow and too sharp for any IND or BMT equipment. The later extensions of the IRT, constituting the bulk of the system, were built to BMT dimensions, and so are of a profile that could support the use of IND/BMT sized equipment. In other words, Division B equipment could operate on much of Division A if station platforms were trimmed and trackside furniture moved. Being able to do so would increase the capacity of Division A. However, there is virtually no chance of this happening because the portions of Division A that could ''not'' accommodate Division B equipment without major physical reconstruction are situated in such a way that it would be impossible to put together coherent through services. The most that can be reasonably hoped for is that some branch lines of Division A might be resized and attached to Division B lines. This was done with the
BMT Astoria Line in
Queens (which had formerly been dual-operated with normal IRT trains and special narrow BMT shuttles), and has been proposed for the
IRT Pelham Line in
the Bronx.
Because the Division A lines are of lower capacity for a given capital investment, all new extensions and lines built since World War II have been for Division B. Division A cars can travel on Division B lines when necessary, but are not used for passenger service on those lines due to the dangerously wide gap between the car and the station platform.
Even during
World War II, which gave a reprieve to the closure of most rail transit in the US, some closures continued, including the remainder of the IRT Second Avenue Line in Manhattan (
1942) and the surviving BMT elevated services over the
Brooklyn Bridge (
1944).
The originally planned IND system was built to the completion of its original plans after World War II ended, but the system then entered an era of
deferred maintenance in which infrastructure was allowed to deteriorate, and closures of elevated lines continued. These closures included the entire
IRT Third Avenue Line in
Manhattan (
1955) and the Bronx (
1973), as well as the
BMT Lexington Avenue Line (
1950), much of the remainder of the
BMT Fulton Street Line (
1956), the downtown Brooklyn part of the
BMT Myrtle Avenue Line (
1969) and the
BMT Culver Shuttle (
1975), all in
Brooklyn.
Only two new lines were opened in this era, the
IRT Dyre Avenue Line (
1941) and the
IND Rockaway Line (
1956). Both of these lines were rehabilitations of existing railroad rights-of-way rather than new construction. The former line was the City portion of the
New York, Westchester and Boston Railway (an electrified commuter line closed in
1937) and the latter a line obtained from the
Long Island Rail Road. While the Rockaway Line is a long and substantial line, it consists mostly of a long right-of-way crossing
Jamaica Bay with a single station on
Broad Channel island and two branches on a peninsula that is only several city blocks wide.
In
1951 a half-billion dollar bond issue was passed to build the
Second Avenue Subway, but money from this issue was used for other priorities and the building of short connector lines, namely a ramp extending the
IND Culver Line over the ex-BMT Culver Line at Ditmas and McDonald Avenues in Brooklyn (
1954), allowing IND subway service to operate to
Coney Island for the first time, the
60th Street Tunnel Connection (
1955), linking the
BMT Broadway Line to the
IND Queens Boulevard Line, and the
Chrystie Street Connection (
1967), linking the BMT line via the
Manhattan Bridge to the
IND Sixth Avenue Line.
In the mid-
1960s,
$600,000,000 was made available to the
Metropolitan Transportation Authority (MTA) of
New York City for the purposes of Subway expansion. $1,230,000,000 was spent to create three
tunnels and a half-dozen holes as part of construction on the
Second Avenue and
63rd Street Lines. Construction would cease in
1975 on account of the city's severe fiscal crisis; none of the sections were usable by the time federal payments were suspended in
1985.
Because the early subway systems competed with each other, they tended to cover the same areas of the city, leading to much overlapping service. The amount of service has actually decreased since the
1940s as many elevated railways were torn down, and finding funding for underground replacements has proven difficult.
Due to deferred maintenance, the condition of the subway system reached dangerous conditions as of the early 1980s. Talk of new construction was considered absurd at that point. However, as of the mid-1980s, reconstruction was begun. Stations were refurbished and rolling stock was repaired and replaced. Around 2002, talk began to circulate about taking up the construction of the Second Avenue subway. Most New Yorkers regarded these plans with cynicism, since citizens were promised the line since well before the Third Avenue elevated was torn down in 1955. Funds have been set aside and environmental impact reports have been completed. A ceremonial Ground-breaking for the Second Avenue Subway was held on April 12, 2007 and contractor work to prepare the project's initial construction site at 96th St & 2nd Ave began on April 23, 2007.
References
★ Harrison Rainie: Tunnels to Nowhere: ''
Washington Monthly'', March 1986.
★ Joseph Cunningham and Leonard de Hart: ''A History of the New York City Subway System'', 1976, 1977, 1993.
Reconstruction and incremental advance