STS-112
STS-112 was a 10-day assembly mission in October 2002 that attached the S1 Truss segment. Atlantis would not fly again until STS-115 on September 9, 2006.
| Contents |
| Crew |
| Mission parameters |
| Docking with ISS |
| Mission highlights |
| Shuttlecam |
| See also |
| External links |
Crew
★ Jeffrey S. Ashby (3), Commander
★ Pamela A. Melroy (2), Pilot
★ Sandra H. Magnus (1), Flight Engineer
★ Piers J. Sellers (1), Mission Specialist
★ David A. Wolf (3), Mission Specialist
★ Fyodor N. Yurchikhin (1) , Mission Specialist - Russia
Number in parentheses indicates number of spaceflights by each individual prior to and including this mission.
Mission parameters
★ 'Mass:'
★
★ ''Orbiter Liftoff:'' 116,538 kg
★
★ ''Orbiter Landing:'' 91,390 kg
★
★ ''Payload:'' 12,572 kg
★ 'Perigee:' 273 km
★ 'Apogee:' 405 km
★ 'Inclination:' 51.6°
★ 'Period:' 91.3 min
Docking with ISS
★ 'Docked': October 9, 2002, 15:16:15 UTC
★ 'Undocked': October 16, 2002, 13:13:30 UTC
★ 'Time Docked': 6 days, 21 h, 57 min, 15 s
===Spacewalks===
| 'Mission' | 'Spacewalkers' | 'Start - UTC' | 'End - UTC' | 'Duration' | 'Mission' | |
|---|---|---|---|---|---|---|
| 44. | STS-112 EVA 1 | David A. Wolf Piers J. Sellers | October 10, 2002 15:21 | October 10, 2002 22:22 | 7 h, 01 min | Installed lines between S0 and S1 trusses |
| 45. | STS-112 EVA 2 | David A. Wolf Piers J. Sellers | October 12, 2002 14:31 | October 12, 2002 20:35 | 6 h, 04 min | Installed future EVA hardware |
| 46. | STS-112 EVA 3 | David A. Wolf Piers J. Sellers | October 14, 2002 14:08 | October 14, 2002 20:44 | 6 h, 36 min | Completed S1 install |
Mission highlights
'STS-112' was an Assembly Mission (9A) to the International Space Station, delivering the S1 truss segment, which provides structural support for the Space Station radiators. It also delivered the Crew Equipment Translation Aid (CETA) Cart to the Space Station. The CETA cart was attached to the Mobile Transporter (launched on STS-110) to be used by assembly crews on later missions. STS-112 also carried several science experiments to the station including the Plant Generic Bioprocessing Apparatus (PGBA), Commercial Generic Bioprocessing Apparatus (CGBA), the Protein Crystal Growth Single-locker Thermal Enclosure System housing the Protein Crystillization Apparatus for Microgravity (PCG-STES-PCAM) and samples for the Zeolite Crystal Growth Furnace (ZCG) experiment.
Shuttlecam
A camera mounted to the shuttle's external tank captured Atlantis' ascent to orbit. This was the first time such footage was recorded. Shuttlecam video
In the response to the Space Shuttle ''Columbia'' disaster (STS-107), the camera was also used on STS-114, STS-121, STS-115, STS-116, STS-117, and STS-118. The Cameras may be used on all remaining Space Shuttle missions.
See also
★ Space science
★ Space shuttle
★ List of space shuttle missions
★ List of human spaceflights chronologically
★ List of ISS spacewalks
★ List of spacewalks
External links
★ NASA mission summary
★ Status reports - Detailed NASA status reports for each day of the mission.
This article provided by Wikipedia. To edit the contents of this article, click here for original source.
psst.. try this: add to faves

العربية
中国
Français
Deutsch
Ελληνική
हिन्दी
Italiano
日本語
Português
Русский
Español



