UPPER SALMON HYDRO ELECTRIC DEVELOPMENT
The 'Upper Salmon Hydro Development' utilizes a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d’Espoir Hydro Electric Development in Newfoundland and Labrador. The plant operates at a normal supply level of 241 m under a net head of 51 metres. The average rated flow of 189.5 m3/s is used to generate 84 megawatts (MW) of electrical power with an average annual production of 541 GWh. The unit, which is equipped with a francis turbine, was first synchronized on January 19, 1983.
This article provided by Wikipedia. To edit the contents of this article, click here for original source.