Amtrak Empire Builder just outside of New Lisbon WI Winter 1985




Title:
Amtrak Empire Builder just outside of New Lisbon WI Winter 1985

Description:
Phase 2 and 3 Superliners, Triple F40's in Phase 3 at speed kicking up a little snow on the SOO/Milwaukee Road double track main line, what could be a better sight! Listen as the famous "Amtrak Jack" is heard on the radio. The date in sometime in Winter 1985. Anybody remember Conductor Amtrak Jack when he worked the Empire Builder?

Author:
Amtrakroadmaster

Tags:
Amtrak, F40,

Related Videos:

Empire Builder in Phase 3 paint. F40's at speed 1989
Amtrak Empire Builder all in Phase 3 with F40's in the lead. Superliners and MHC cars. CTH O just east of Wisconsin Dells, WI. The date is June 1989.
Eastbound Amtrak Empire Builder F40's MP183 Detector
Eastbound Amtrak Empire Builder West of POG at MP 183 Detector. F40's: Phase 3 and Phase 4 equipment. November 1996
Empire Builder Amtrak 808 Cold winter day outside PORTAGE WI
Here is the short section of the then tri-weekly SEA/PDX Empire Builder, this is one of the days when the Empire Builder #808 only went as far as MSP. It is a cold winter day, January 10, 1997. 808 is just east of POG.
Amtrak's Empire Builder Sept. 1985 F40's Phase 3
Amtrak Empire Builder at CTH O along STH 16 in Columbia County Wisconsin, just east of Wisconsin Dells. Train #7 pulled by Amtrak's longest running engine the F40. Superliner cars in Phase 2 and 3 paint. On the Milwaukee Road/SOO Line double track Main before the CP Rail destroyed a good thing. September 1985
Amtrak Empire Builder at Wisconsin Dells 1992 with F40's
Amtrak #8 at WI Dells on April 14, 1992. F40's, ex ATSF Hi level Amtrak Crew car, Phase 3 paint Superliners. This is when the loading of passengers was done from the opposite side of the depot on the South side platform, just after the taking out of the 2nd main track before the platform was extended.
AMTRAK Capitoliner around the Loop 1985
Ride along on the head end as Capitoliner equipment travels around the loop to Sunnyside Yard in 1985
Fast Amtrak Regional Passing Secaucus Junction
A Fast Amtrak Regional headed towards New York Penn Station skips Secaucus Junction doing about 60 mph.
Amtrak # 311-Missouri River Runner
Amtrak's 311 Missouri River Runner arrives in Kansas City.
Before Reno Trench. Amtrak California Zephyr makes Street Level station stop.
See Amtrak's California Zephyr make it's station stop at RENO at street level. Follow the Zephyr as it heads Westbound at Street level, making noise for every street crossing. Date is June 4th 2001.
Empire Builder Amtrak Westbound to Seattle
Empire Builder Amtrak Westbound from the foot of the Cascades, many bridges over the Skykomish River, to Everett and then Edmonds, and then Seattle Washington in late April 2009
TripAtlas.com on Facebook